■ News
January 2010
Planning permission obtained for Nursing Home extension at Sandown, Isle of Wight.
Biggs Talbot Architects join "Buy with Confidence" scheme run by the Isle of Wight Council.
April 2010
BTA continuing professional development takes place in the context of maintainence of CDM co-ordintor role as defined by the Construction Design management Regulations 2007 (CDM 2007).
May 2010
Shanklin eco-loo completed bringing to an end the current phase of public conveniences designed by Biggs Talbot Architects on behalf of the Isle of Wight Council.
June 2010
Robert Biggs joins Chamber of Commerce Construction hub. The hub has been set up to assist the construction industry on the Island with its initial role being to try to assist the Isle of Wight Council to rationalise its construction work procurement system and also to bring to the attention of the Local Planning Authority the thoughts and wishes of all construction professionals.
Biggs Talbot Architects in accordance with its own policy to assist schools on the Island took on two work experience students during the month
July 2010
Works completed to refurbish building elements at Ryde Cemetery
Works completed at Sandown Christ Church in conjunction with grant aid from English Heritage. The Grade 2 listed building was identified as a positive case study by EH's Caring for Places of Worship Survey 2010. The church is located on the Broadway adjacent to the Heights Leisure Centre and work was carried out by G.J.Banks Ltd of Cowes
